> ## Content Index
> Fetch the complete content index at: https://playbooksforleaders.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# RACI Matrix
- URL: https://playbooksforleaders.com/team-people/065-raci-matrix/
- Published: 2026-07-11T14:49:51.000Z
- Updated: 2026-11-16T18:05:30.000Z
- Description: A responsibility assignment matrix clarifying roles: Responsible, Accountable, Consulted, and Informed.
- Author: Will Rowan
- Tags: #team-people, #lang-en

## What is a RACI matrix?

RACI is a responsibility assignment matrix. For every activity or decision, you mark who is Responsible (does the work), Accountable (ultimately answerable, only one), Consulted (asked before the call), and Informed (told after). The grid forces you to spell out the roles that everyone usually leaves implicit.

Something fell through the cracks again. Three people were on the email. Each thought one of the others was handling it.

![A grid with five people columns (Alex, Blake, Casey, Drew, Emma) and four task rows (Launch Plan, Press Release, Budget, Demo), cells filled with colour-coded letters R, A, C, I. A legend maps R to Responsible, A to Accountable, C to Consulted, I to Informed; a footer bar reads "Two roles is no role."](https://playbooksforleaders.com/assets/img/tool-visuals/065-raci-matrix.svg)

Method visual: RACI Matrix

## When should you use a RACI matrix?

Most accountability problems aren't about people refusing to step up. They're about no one ever actually being asked to. RACI surfaces the gaps (cells with no A, or worse, multiple As) that explain why the same work keeps falling through. The conversation building the matrix is more useful than the matrix itself; the disagreements that come up are the ones the team would otherwise discover under pressure.

A RACI matrix works for cross-functional work where multiple teams or specialists touch the same activities. It's overkill for small co-located teams who already know who's doing what. And it tips into bureaucracy if maintained too granularly: a RACI for every meeting agenda is the failure mode.

**Your next move:** *Which decision in your team currently has either no Accountable or three of them, and how long has that been quietly producing the friction everyone complains about?*

### What it looked like for them

**Neil Cresswell, Portainer, early years.** Portainer had hired for the organisation it hoped to become: complex roles, management layers, heavy process. Everything was bolted on too early. The artificial maturity slowed the team down and burned cash. Nobody was clear on who owned what because the structure had been copied from companies ten times Portainer's size.

Cresswell's move was to strip it back. He let go of people who couldn't work in ambiguity. Cresswell resized the roles at Portainer to match what the company actually was, not what it aspired to be. The surviving team was smaller and faster. Critically, it was clear on who was responsible for what.

A RACI matrix would have exposed the problem before the headcount grew: too many people Consulted, not enough Accountable, and the Responsible column either blank or pointing at everyone. Survival came from admitting what the company actually was. RACI makes that admission structured rather than painful.

## Which Playbooks use a RACI matrix?

You use a RACI matrix in the Plan of one Playbook:

- [I've inherited a team and I don't know what they should be working on.](https://playbooksforleaders.com/team-people/inherited-team/)

## What works well with a RACI matrix?

Pair a RACI matrix with [Stakeholder Mapping](https://playbooksforleaders.com/team-people/068-stakeholder-mapping/) and [Team Charter](https://playbooksforleaders.com/team-people/070-team-charter/).

## When shouldn't you use a RACI matrix?

If your team is small, sits together and already knows who's doing what, skip the RACI matrix. A RACI for every meeting agenda is bureaucracy.

## How long does a RACI matrix take?

About half a day. You come away with a document.

**Where it comes from:** [T. Hamilton, "Clarifying Responsibility Relationships", California Management Review, 1968](https://cmr.berkeley.edu/1968/05/10-3-clarifying-responsibility-relationships/?ref=playbooksforleaders.com)

**Learn more:** [Atlassian: RACI Chart: What is it & How to Use](https://www.atlassian.com/work-management/project-management/raci-chart?ref=playbooksforleaders.com)