I'm behind and I have to decide what to drop.
“I'm behind and I have to decide what to drop.”
The feelingUnderwater.
If that’s where you are right now, this is the Playbook built for exactly that moment.
“Behind, what to drop” is one of 40+ Playbooks for Leaders Playbooks, for leaders facing a specific, real situation. In under fifteen minutes it helps you recognise what’s actually going on, then gives you a clear way through: the Play to choose, the Plan in concrete moves, the Precedents of people who faced it before, and your next move.
Frameworks you’ll see put to work on this exact decision, applied, not taught in the abstract:
- RICE Scoring
- Product Metrics Hierarchy
- T-shirt Sizing
You’ll also see how it played out in the real world, Marvel Entertainment, New York (1996), and Anne Mulcahy at Xerox, Stamford, Connecticut (2001). Real precedents, not platitudes.
It leaves you with one question to carry into your next conversation: “What’s still on the plan because cutting it would admit what last quarter cost - and whose face are”
Part of the Strategy & Direction collection, Playbooks for when the direction shifts, priorities collide, or you have to reset the plan. See them all ›
Transcript: read it in full
What to do when you're behind and have to decide what to drop
Late December nineteen ninety-six. After heavy losses in nineteen ninety-five and nineteen ninety-six, Marvel files for bankruptcy, carrying about two hundred and fifty million dollars of debt. Its share price falls to ninety-six cents.
In June nineteen ninety-eight Marvel merges with Toy Biz, a toy company, to leave bankruptcy. It keeps publishing comics.
Marvel licenses the film rights to its characters to other studios. Sony releases Spider-Man in two thousand and two. Marvel earns more from toys and other products than from those films.
In two thousand and five Marvel raises five hundred and twenty-five million dollars to make up to ten films of its own. Marvel Studios releases Iron Man in May two thousand and eight. In two thousand and nine Disney buys Marvel for four billion dollars.
Marvel did not drop its comics, and a merger and licence fees carried it out of bankruptcy. What it held back from, until two thousand and five, was making films itself. Other studios paid for them, and Marvel earned from the characters.
When you're behind and have to decide what to drop, the useful cut may be a cost you leave to someone else, not a product you close.
Find what you're protecting because cutting it admits a cost
So let's go to the office and work through it.
"I'm behind and I have to decide what to drop."
The feeling is underwater.
Every option looks painful. Every option means wasting something you've already invested in. The plan you started the quarter with no longer fits the time you have left, and the discipline of cutting it down to the time available is the discipline you've been postponing.
Two choices. They look like the same problem. They need different first moves.
When sunk cost won't let you let go
Choice one: you won't let go. Every option looks painful because every option means wasting something you've already invested in. The plan is held together by sunk cost rather than by current value, and you've been ranking options by how much it would hurt to cut them.
If that's the read, cut the task that has consumed the most time with the least visible progress. Not the one you think is least important. The one you've spent most on.
Daniel Kahneman and Amos Tversky, working on what they called the sunk cost fallacy, found that people are terrible at ignoring what they've already invested in something. The investment looms larger than the future return. The only reliable way to break the grip is to cut the biggest weight first. Everything you cut afterwards will feel easier by comparison, which is the point — the first cut is the one that recalibrates your sense of what a cut costs.
When you're about to cut blind
Choice two: you haven't decided what's worth protecting. You're about to cut indiscriminately because everything feels equally compromised. The cuts will leave a release that looks like a series of compromises rather than a coherent product, because there's no centre of gravity for the cuts to organise around.
If that's the read, protect one thing disproportionately. Cut more from everything else than you need to, and use the saving to over-invest in one highly visible element. A polish detail, a launch moment, a single feature that works so well it reframes the whole release.
Will Guidara, working on what he calls unreasonable hospitality, observed that one disproportionate gesture in a constrained product can change the way the whole thing reads. You're not hiding the cuts. You're making sure there's at least one thing the user sees that proves the cuts weren't capitulation. The gesture is what keeps the release from feeling like an apology.
Sunk-cost or no-anchor. Same behind-schedule project. Two different first moves.
Cut with structure, not with instinct
Three tools. The discipline is to cut with structure, not with instinct.
Trace every item back to a top-line outcome
The first is
the Product Metrics Hierarchy.
The Product Metrics Hierarchy was popularised by Amplitude in their product-analytics writing through the mid twenty-tens, drawing on the OKR tradition codified by Andy Grove at Intel in the nineteen-seventies and the driver-tree approach to corporate finance that goes back to DuPont's analysis framework in the nineteen-twenties. The discipline is structural rather than novel.
The reason the Product Metrics Hierarchy matters when you're deciding what to drop is that the team usually can't agree on what's important until they trace each item back to the top-line business outcome it's serving. Without the trace, every feature feels equally legitimate, and every cut feels equally arbitrary.
The unique insight is the traceability requirement. Every feature on the plan has to be defensible as serving a specific top-line metric — and the top-line metric has to be defensible as serving a specific business outcome. Features that can't be traced are easy to drop, because they weren't doing anything anyone could defend in those terms anyway.
What you get is a structural test for what to cut. Not I think this matters less, which is opinion. This feature can't be traced to any of our top-line metrics, which is structural. The hierarchy does the cutting.
So. How to use it.
Define. One sentence. Activated paying customers per quarter, gross merchandise volume, daily active subscribers. Whichever your business actually runs on.
Map. Two or three input metrics that drive the top-line. Activation rate times monthly traffic. Listings per seller times buyers per listing times conversion rate. The arithmetic has to compose; if it doesn't, the lower-level metrics aren't actually drivers.
Trace. Each remaining item on the plan has to be defensible as moving one of the input metrics. If it can't be, the feature is decorative.
Cut. They were never serving anything in the hierarchy anyway. The decision is structural, not personal.
The hierarchy sometimes also reveals that the team has been investing heavily in metrics that don't actually compose into the top-line outcome — and that the top-line is being pulled by something the team isn't formally tracking at all. That diagnostic is worth as much as the cuts themselves.
Defend the funnel stage you're leaking at
The second is
Pirate Metrics.
Pirate Metrics — AARRR — was coined by Dave McClure in two thousand and seven in a startup-metrics presentation that travelled widely across the early Y Combinator and SaaS communities. The acronym stood for Acquisition, Activation, Retention, Referral, Revenue, with the deliberate joke that read out loud it was the noise a pirate makes. The framework has since become the canonical funnel diagnostic for early-stage product teams.
The reason Pirate Metrics matters when you're cutting is that funnel-stage matters. A feature improving acquisition is not interchangeable with a feature improving activation, even if the spreadsheet says they have the same expected value. The funnel is sequential — losing activation matters more if you're already doing well on acquisition, because the activation drop wastes the acquisition you've already paid for.
The unique insight is the funnel-stage diagnostic. The five letters are not a list of metrics; they are stages a single user passes through, in order. The right thing to cut depends on which stage your funnel is currently leaking at — and the wrong thing to cut is whichever stage is closest to the stage you have a problem with.
What you get is a structural reason to defend specific metrics against the across-the-board cut. Not all metrics matter, which produces no cuts. Not only revenue matters, which produces the wrong cuts. We're leaking at activation; the activation features stay; the others can be cut.
So. How to use it.
Map. Per-stage numbers. Ten thousand acquired, eight hundred activated, four hundred retained, fifty referring, two hundred revenue. The numbers don't have to be exact; the order of magnitude per stage is what matters.
Find. Which stage has the worst conversion to the next? Most teams discover their leak isn't where they assumed it was. The leak is the diagnostic.
Defend. Features serving the stage you're leaking at — and the stage immediately upstream — get protected. Features serving stages elsewhere can be cut.
Cut. With the funnel diagnosis explicit, the cuts read as structural rather than as preference. The team is cutting features that serve stages where the funnel is healthy.
The framework is what stops the team from cutting an activation feature to save an acquisition metric that looks better in isolation but matters less.
Check fast whether the remaining work fits the time
The third is
T-shirt Sizing.
T-shirt Sizing as a discipline traces through the agile estimation literature of the early two-thousands — Mike Cohn's Agile Estimating and Planning, two thousand and five, is the canonical text — and earlier through the COCOMO and Wideband Delphi traditions of software engineering estimation that go back to the nineteen-seventies. The contemporary form — small, medium, large, extra-large — is deliberately rough.
The reason T-shirt Sizing matters when you've cut down to a defensible scope is that you now need a fast estimate of whether the remaining work fits the time you have. Detailed estimation is too expensive at this stage; the team has been re-planning for a week and another week of detailed estimation is the wrong investment. T-shirt Sizing is the rapid alternative.
The unique insight is that roughness is the feature. The small, medium, large, and extra-large bands are crude on purpose. Crude estimates are fast, and they expose the gross structure of the remaining work without the team getting lost in story-point arguments. The right move at this point is fast and approximately correct, not slow and precisely wrong.
What you get is a slim, defensible version of the plan you can take to stakeholders within hours rather than weeks. The estimates aren't promises; they're a structured first cut at whether the cut-down scope still fits the available time.
So. How to run it.
Set. Pick four or five sizes. Small, medium, large, extra-large. Define each one in capacity terms — small is one engineer one week, medium is two engineers two weeks, and so on. The team has to share the definition for the estimates to be commensurable.
Size. Whole team in a room, or Slack. Each item gets a quick discussion and a size. Disagreements surface assumptions, which is useful; they don't need to be resolved with precision, which would be expensive.
Sum. Total the sizes against your available capacity. If the cut-down scope still doesn't fit, you cut more.
Re-cut. The arithmetic is brutal but clear. Either the work fits, or another round of cuts is needed. The hierarchy and the funnel from the previous tools tell you which to drop next.
The roughness is what makes this tool work in a behind-schedule context. Detailed estimation in a behind-schedule context is itself the slip, because it consumes capacity the team needs for the work.
A precedent: refusing to cut the one category that holds the future
That's the toolkit. One more story before we close.
Marvel at the cold open kept its comics, and left the cost of making films to other studios. The story we close with is about what to protect when you cut almost everything else. — the discipline of refusing to cut a category, against pressure, because the future of the company sat in a pipeline that had not yet shipped.
August two thousand and one. Anne Mulcahy becomes chief executive of Xerox. The company owes over seventeen billion dollars and has lost money six years running. The US Securities and Exchange Commission is investigating the accounts of its Mexico unit. Xerox is advised to seek bankruptcy protection. The share price falls fifteen per cent on the day her appointment is announced.
She halves capital spending and total debt, and cuts sales, general and administrative costs by a third. She closes an ink-jet printer division she had started. The workforce falls from about eighty thousand to fifty-eight thousand.
One budget she leaves alone. As she tells Stanford's business school in two thousand and four: even with all of the cost cutting we did, we didn't take a dollar out of research and development.
She also writes a mock Wall Street Journal article describing Xerox in two thousand and five, with performance figures and even quotes from analysts.
By her own later count, about eighty per cent of what is in the article materialises.
The deeper point: the harder question is what to protect
When you're behind and have to decide what to drop, the harder decision is often what to protect. Mulcahy cut almost everything, and left research and development whole. — because that was the place the company's future was structurally located, and cutting it would have been cutting the company's reason to recover.
So. Your Next Move from this playbook.
What's still on the plan because cutting it would admit what last quarter cost — and whose face are you saving by keeping it?
Two behavioural Plays. Each positions you differently for the next conversation. You choose.
Play A
A named stance, with the outcome it sets up.
Play B
The counter-stance for the same moment.
- A Plan of tools
Tools from the Toolbox, in order, each ending in Your Next Move: one concrete instruction.
- Precedents
Leaders who stood here. We show whose play worked, half-worked, and shouldn’t have been attempted.
The full Playbook includes the video walkthrough, both Plays in full, the Plan tool by tool, how each precedent played out, and your next move.
“The list was never the hard part. Standing behind the cut, in the next three conversations, is.”
Sources & further reading 3 Positions, 4 Plays, 3 Plans, and 2 Precedents.
Your Next Move
Questions, answered
How does a Playbook work?
A Playbook names your Position, hands you two Plays to choose between, then turns your choice into a Plan: a sequence of tools, each ending with a single concrete move. It closes on Your Next Move: the one thing to do before the day ends.
How long is a Playbook?
Around fifteen minutes. Short enough to watch in the gap before the meeting it’s made for.
What’s the difference between this and asking AI?
A chatbot gives you an answer. A Playbook gives you a Position, a chosen Play, a Plan, and Precedent: the structure of a decision, not a paragraph of advice. You open the situation you’re in rather than describing it from scratch.
Do I need to watch them in order?
No. Each Playbook stands alone. You open the one that matches the situation in front of you, and there’s no sequence to follow and nothing to complete first.
What is Your Next Move?
The single concrete move you leave with: a question to take back into the room and answer there. Every tool in a Plan ends with one. It’s the answer to the question the brand name asks.